Missing/Late OJT Hour Submission Name First Last EmployerEmail Select your tradeCarpentryElectricalHVACLaborerPipefittingPlumbingSheet MetalRecord hours in each work processMonthYearABCDEFGHITotal Add RemoveA. Foundations, Walls and Floors 1500 1 B. Framing (foundations and walls) 800 2 C. Roofs 800 3 D. Exterior mill work 1,000 4 E. Interior wall coverings 500 5 F. Floors 500 6 G. Stairs 500 7 H. Interior finish 1,000 8 I. MiscellaneousA. Foundations, Walls and Floors 1500 1 B. Framing (foundations and walls) 800 2 C. Roofs 800 3 D. Exterior mill work 1,000 4 E. Interior wall coverings 500 5 F. Floors 500 6 G. Stairs 500 7 H. Interior finish 1,000 8 I. MiscellaneousRecord hours in each work processMonthYearABCDEFTotal Add RemoveA. Preliminary work 600 2 B. Residential and commercial rough wiring 2,500 3 C. Residential and commercial finish work 1,500 4 D. Industrial lighting and service installation 2,000 5 E. Troubleshooting 1,000 6 F. Motor installation and control 400Record hours in each work processMonthYearABCDEFGTotal Add RemoveA. Sanitary & storm sewer system work B. Soil, waste, and venting piping C. Water supply systems D. Plumbing fixtures, appliances & water 1,200 2,100 1,700 1,500 500 500 500 8,000 Total treatment equipment E. Tool & site safety. On the job equipment use F. Piping, welding and rigging of equipment G. High/low pressure boilers and chilled water cooling systemsRecord hours in each work processMonthYearABCDEFGTotal Add RemoveA. Use of Hand Tools 350 1 B. Use of Machine Tools 1,000 2 C. Flux, Rivets, Fastening 500 3 D. Measurement & Layout 650 4 E. Benchwork 1,100 5 F. Welding 750 6 G. Installing Duct Work 2,050 7 H. Fabrication & Install ventilators 1,000 8 I. Safety 500 9 J. Insulate Duct 100Record hours in each work processMonthYearABCDEFGHIJKLM Add RemoveA. General Trade (Use/care of tools,equipt&safety) 800 1 B. Installation & service (compression systems) 750 2 C. Regrigerant controls 450 3 D. Motor controls (installation and service) 450 4 E. Electric motors (service) up to 5 horsepower 300 5 F. Installation & service (absorption systems) 300 6 G. Installation & service (hermetic, semihermetic) 300 7 H. Commercial regrigeration (various applications) 1,500 8 I. Installation & service (air conditioning systems) 800 9 J. Installation & service (heating equipment) 800 10 K. Installation & service (fuel-burning equipment) 400 11 L. Boiler room piping (service & installation) 400 12 M. Installation (heating systems 750Record hours in each work processMonthYearABCDEFGH Add RemoveA. General Trade Orientation B. Fabrication of Systems Components C.System Installation & Connections D. Equipment Installation E. System Maintenance F. Equipment Repair G. Machine Shop Practice H. Miscellaneous Record hours in each work processMonthYearABCDEF Add RemoveA. Site/project prep & maintenance B. Tools, Equipment & Materials C. Safety D. Environmental Remediation E. Building Construction F. Heavy/HWY ConstructionMONTHS ENTERED Quantity Price: $25.00 Quantity Total Credit Card